
- Unload and inspect the cooler
- Check correct Model No.
received
- Read and understand the
Employer & Employee Section
- Read Installation Manual
SAFETY
FIRST!
- Check cooler location
- Be aware of local regulations
- Discuss changes with customer
7
Step 1
Page 2Step 2
Step 5
Step 6
Page 4Step 4
Page 12Step 8
Page 9Step 7
Page 14Step 10
Page 13Step 9
Page 4Step 3
- Construct cooler mounting frame
- Position cooler using appropriate
lifting equipment and methods
- Use proven methods to connect
cooler to ductwork
- Fill in the installation checklist
- Commission the cooler
- Remove and recycle packaging
- Show the customer how to operate
their new cooler
- Give the customer the Instruction &
Operation Manual
- Ensure customer understands service
& maintenance requirements
- Connect mains power to cooler
REMEMBER - SAFETY FIRST
REMEMBER - SAFETY FIRST
- Connect water to cooler
ENSURE JOINS ARE SEALED TO
PREVENT LEAKS
ROOF TOP INSTALLATION
SIDE DISCHARGE
TOP DISCHARGE
DOWN DISCHARGE
Ductwork
Flexible Connector.
DANGER
RP INDUSTRIAL AIR CONDITIONERS
Kommentare zu diesen Handbüchern